5. High and Dry Lightweight Floor/Ceiling Equipment
 

In order to build lightweight material-saving floors at ground level or to make upper floors for multi-storey buildings the contractor will need 4 precast components:-

1. Waffle form
2. Hollow column block
3. Column top slab
4. Concrete temporary positioning bracket



The equipment needed to produce the above elements comprises:-
1) A large format vibrating table (electric or hand-powered)
2) Waffle setting moulds 600mm square
3) Precasting skirt (attaches to the vibrating table to form the waffles)
4) Setting forms for column top slabs 600mm square
6) Precasting skirt for column top slabs
7) 2-piece steel mould for producing temporary concrete brackets 4 at a time
8) Set of production accessories

The quantity of elements produced each day is controlled by the number of moulds supplied and the labour hours available.

A typical High and Dry plant consists of:

  1. Vibrating machine plus attachments
  2. 20-30 Waffle setting moulds
  3. 4-5 Column top slab setting forms
  4. 1 steel mould for column blocks
   

THE EQUIPMENT KIT



 

The vibrating machine can also be used to produce roofing tiles, decorative slabs, hollow and curved blocks.

FULL TRAINING COURSE AND TECHNICAL SUPPORT AVAILABLE

 

 

 

OUR COMPANY : OUR APPROACH : OUR WORK
NEWS : CONTACT US : OTHER SITES : HOME

JPM Parry & Associates Ltd, Overend Road, Cradley Heath, West Midlands B64 7DD
Tel: +44 (0) 1384 569 171 Fax: +44 (0) 1384 637 753 E-mail: info@parryassociates.com


Page last updated: 26 November, 2007
Company no: 1121110 Registered in England
Registered office: Overend Road, Cradley Heath, West Midlands B64 7DD
Copyright © 2007 JPM Parry & Associates Ltd